Computer sciences and Information technology
IT425-1403A-01 : Systems Analysis, Design and Integration
Project description
Phase 3 – Task 2
Task Type: Individual Project
Deliverable Length: 2?3 new pages
Points Possible: 100
Due
Weekly tasks or assignments (Individual or Group Projects) will be due by Monday, and late
submissions will be assigned a late penalty in accordance with the late penalty policy found in the
syllabus. NOTE: All submission posting times are based on midnight Central Time.
Testing and quality assurance is also an important phase within the software development life cycle
(SDLC); however, it can start as early as the design phase and continue into deployment. Planning
for these during the design phase and executing during development and implementation is critical
and could halt final deployment until discovered errors are corrected.
Assignment
For this assignment, you will develop a plan for at least 3 types of tests, and describe the
quality controls that you plan to perform quality assurance.
The project deliverables are as follows:
Update the System Requirements, Design, and Implementation Specification title page with the new
date. Update the previously completed sections based on the instructor’s feedback.
Test and Quality Assurance Plan
Develop a plan for unit testing. Include specific application functions that will be tested and how
the tests will be conducted.
Develop a plan for system testing. Include areas that you will test within both the application and
a system as a whole and how errors will be tracked and reported.
Develop a plan for user acceptance testing. Include key stakeholders who should perform the test
and how they will record any issues that they find.
Develop a quality assurance plan. Include specific quality assurance methods or control, what their
purpose is, and in which phase they will be utilized.
Name the document “yourname_IT425_IP3.doc.”