Select one of the following RFP procurement cases to develop your PP1 RFP:
A New Practice Field
You own a semipro baseball team (in the location of your choice) and you want to construct a new practice field. You own the land already (20 acres). The land is relatively flat and it has only a few dilapidated structures (barns) and trees on it. Connecting up with existing water and sewer lines would present no unusual technical problems. It is now September, and you would love to have that field ready to go by March two years hence. Your vision would include the playing field, a small clubhouse, and a parking area that would hold about 50 cars. No spectator seating would be required. The decision to go with one general contractor has already been made.
An Environmental Impact Study
You are a general contractor wishing to put up a modest sized cement production plant on the outskirts of town. The plant would operate on only one 10-hour shift per day and would produce about 400 cubic yards of output per day for six days per week. It is necessary for an environmental impact study to be undertaken before the county can issue a permit. The biggest issue is, of course, the air quality implications of cement production, but potential impacts on water quality are of concern as well. It is now October, and you want to start building the plant by the end of next summer, if at all possible. It is now time to issue an RFP to procure an environmental impact analysis. Studies of this type normally require about three months of concerted effort by a team of analysts.
An Inventory Control System
You sell seeds from a catalog, and business has been blossoming. However, your inventory tracking system is inadequate. In high season, supply outages have been frequent, and customer complaints over delays have been increasing. You fear that your business will die on the vine unless something is done to improve things. You want to hire a management consultant to design a new inventory tracking system. This kind of work normally requires about six months worth of effort. It is now May. You need to issue an RFP for this work. The procurement will be for the design stage only—implementation may or may not be handled under a separate contract at a later date.
The first page of your overall submission must be a cover sheet that contains the project title (hopefully, not “PP2” or anything like it—be inventive), your name, your e-mail address, and course identifying information (e.g., “PROJ598 for this term” will suffice—obviously, use the correct term identifier). The second page will be a Table of Contents (TOC) listing the major RFP sections together with page numbers. Include on this page a listing of the references that you used in the RFP preparation, including websites, if any. The next 1-to-10 pages constitute the main body of the RFP. Appendix B contains a list of suppliers to whom you would send the RFP. These must be real bona fide contractors—not hypothetical ones. On that page, say how you chose these potential suppliers. The cover sheet, TOC/references page, and supplier list do not count toward the 10-page limitation.
The structure should, therefore be:
Cover sheet (one page)
Table of contents and references (one page)
RFP main body (no more than 10 pages)
Appendices (no page limit)
Appendix B: Supplier list (one page)